Commercial exterior upkeep is the regular care of everything outside a building that customers, tenants and staff touch first: the parking lot, walkways and entrances, doors, gates, awnings, exterior lighting, signs and address numbers. The simplest way to manage it is as one program, with a yearly walk-around, a list of items by priority and a plan for which work needs a permit. In Vancouver, awnings, most signs and new exterior lighting all have permit rules, so knowing them early saves surprises.
This guide is for owners, landlords, property managers and business owners with retail, office, restaurant, cafe, industrial or warehouse property in Vancouver and across Metro Vancouver. If you manage an industrial site, our industrial property maintenance guide covers the inside of the building and its safety systems. For sign permits in detail, see our guide to Vancouver retail sign permits.
TL;DR
- Treat parking, entrances, gates, awnings and signs as one exterior program, not separate one-off repairs.
- In Vancouver, awnings on commercial buildings and most signs need a permit, each sign needs its own permit, and lighting needs a separate electrical permit.
- Plan work around customers: phase it, keep a safe entrance open, and set up proper traffic control in the parking area.
What does commercial exterior upkeep cover?
Most commercial properties have the same core exterior items. A good program lists each one, notes its condition, and decides whether it needs routine care, a repair or a planned replacement:
- Parking areas: the driving surface, line markings, stall numbers, wheel stops, curbs and parking signs.
- Walkways and entrances: paths from parking to the door, steps, ramps and handrails, and the entrance doors, closers and hardware.
- Gates and fencing: vehicle and pedestrian gates, overhead and rolling gates, and security fencing.
- Awnings and canopies: frames, fabric or panels, fastenings and any lighting.
- Signs and identification: business signs, directional signs, and the building's street and suite numbers.
- Exterior lighting: parking, entrance, sign and wall lighting.
For each item, it helps to record who is responsible. In leased properties, the landlord often handles shared areas, while tenants may look after their own storefront, doors and signs. Every lease is different, so check yours before you book work.
How should you look after a commercial parking lot?
The parking area is often the first thing a customer sees and the place most exterior issues start. Walk it at least once a year, and again after heavy rain, looking for damaged or uneven surfaces, faded line markings, loose wheel stops, broken curbs, blocked drains and missing or damaged signs.
Accessible parking deserves its own check. Vancouver's Parking By-law sets rules for accessible parking spaces, including their size, slope and clearance, and the City's accessibility guidance for businesses asks whether your parking includes a well-marked accessible stall. When you repaint lines or rework a lot, keep accessible stalls marked, level and clear, and check the current by-law before you change their layout.
Plan larger work, such as resurfacing or re-striping a whole lot, for quieter hours and in sections, so the business can keep trading.
What keeps entrances safe and welcoming?
Entrances get the most wear on any commercial property. A regular check should cover:
- Doors that open, close and latch properly, with closers adjusted and hardware tight.
- Thresholds, mats and the ground right outside the door, kept level and free of trip edges.
- Steps, ramps and handrails that are solid and in good repair.
- Glass, frames and door signs that are clean, intact and easy to read.
- Entrance lighting that works, so the door is easy to find after dark.
Exit doors and the routes leading to them also matter for life safety, so keep them clear of storage, displays and parked equipment.
What should you check on gates and fencing?
Vehicle gates, overhead and rolling gates, and fencing protect the property after hours, so a gate that sticks or will not lock is a security problem as well as a repair. Look for bent or rusting frames, damaged tracks, worn hinges and rollers, loose posts, and locks or operators that do not work smoothly. Powered gates should be serviced by a qualified technician, and any new wiring for a gate operator or exterior lighting needs an electrical permit in Vancouver.
Do awnings and canopies need a permit in Vancouver?
Usually, yes. The City of Vancouver's sign permit page says permits are required for all awnings on private property. On the outside of a commercial or industrial building at the first floor or below, that is a sign permit; above the first floor or on other building types, a development permit and/or a building permit may be needed instead.
The City's sign and awning guidance adds a few points that often catch people out:
- Lighting an awning needs a separate electrical permit, which can be applied for at the same time.
- A sign hung under an awning needs its own sign permit.
- A property on the Vancouver Heritage Register also needs a heritage alteration permit, which City staff review as part of the application.
If the work happens over a City sidewalk, for example using a lift or scaffolding in the air space above it, a construction street use permit may also be needed.
When do commercial signs need a permit?
In Vancouver, a sign permit is required for all signs on private property, except a few listed exceptions such as signs showing only the building number and street name, and signs inside a building that cannot be seen from the street. Each sign needs its own permit, and lit signs need electrical work and permits as well. After the permit is issued, the City says the work must be finished and an inspection requested within 12 months, or the permit is no longer valid.
Rules differ across Metro Vancouver. In Surrey, for example, the City says a sign permit is required for any new sign or to reface an existing sign, and a building permit may be needed first for a new awning or canopy. Always check with the city where the property is before ordering a new sign.
Address numbers are part of signage too. Emergency crews rely on them, and Vancouver's Building By-law asks owners to keep the street number posted where it is easily visible from the street. If numbers have faded, been covered by a new sign or are hidden by landscaping, put them on your list.
How do you do exterior work while the business stays open?
Most exterior work at a commercial property happens around customers, tenants and deliveries. A few habits keep it safe and keep the doors open:
- Phase the work. Do the parking lot in sections and keep at least one entrance and one safe walking route open at all times.
- Set up traffic control. In BC, WorkSafeBC's Part 18 traffic control rules require employers to provide effective traffic control whenever traffic could be hazardous to a worker, and a qualified person must complete a risk assessment before workers are exposed to traffic.
- Tell people early. Give tenants and staff notice of closures, temporary entrances and delivery changes.
- Keep paperwork in one place. Track permits, inspections and warranties for signs, awnings, gates and lighting, so the next repair starts from good records.
For bigger projects in an occupied property, our guide to renovating a commercial building while it stays open covers phasing, dust, noise and access in more depth.
How do you build an exterior maintenance plan?
A simple plan is enough for most properties:
- Walk the site. Note every exterior item, its condition, and photos, ideally at the same time each year.
- Sort by priority. Put safety items first, such as trip hazards, broken lighting, damaged handrails and gates that will not lock, then items that affect how the property looks to customers and tenants.
- Flag permit items. Mark anything involving new or changed signs, awnings, canopies or electrical work, and check the city's rules early.
- Group the work. Combine items in the same area, such as an entrance refresh with new lighting and signs, so the site is disrupted once rather than several times.
- Keep records. Save permits, inspection results and product information for the next owner, manager or tenant.
Exterior work often lines up with a tenant change or an interior renovation, which is a good time to refresh the storefront, signs and entrance together.
How Multigroup Contracting helps
Multigroup Contracting is a commercial general contractor and fee-based construction manager founded in 2016, with our Vancouver office at 700-838 West Hastings St. We are registered with WorkSafeBC and carry $5M in liability insurance. We help owners, landlords, property managers and business owners in Vancouver and across Metro Vancouver plan and complete exterior upgrades as part of commercial projects, coordinating trades, permits and inspections and keeping the business open while we work. See our commercial construction, retail buildouts, tenant improvements, coffee shop renovations and warehouse renovations services.
Tell us about your property and what needs attention outside. Get a free quote, call 778-819-5933 or email info@multigroup.ca.
FAQ
What does commercial exterior maintenance usually include?
It usually covers the parts of a property customers and staff use every day: parking areas and line markings, walkways and entrances, doors and hardware, gates and fencing, awnings, exterior lighting, signs and address numbers. Keeping them on one program makes problems easier to spot and plan for.
Do I need a permit to replace an awning in Vancouver?
Usually, yes. The City of Vancouver requires a permit for awnings on private property. On a commercial or industrial building at the first floor or below, that is a sign permit; higher awnings or other building types may need a development or building permit. Lighting an awning needs a separate electrical permit.
Does repairing or repainting a sign need a new sign permit?
New signs need a permit in Vancouver, and each sign needs its own permit. Whether a repair, repaint or change of wording needs one depends on the work, so confirm with the City's Development and Building Services Centre before work starts. A lit sign can also need an electrical permit.
Who is responsible for exterior upkeep at a leased commercial property?
It depends on the lease. Landlords often look after shared areas such as parking lots and common entrances, while tenants may be responsible for their own storefront, signs and doors. Check your lease and agree who handles each item before work is booked.
How can exterior work be done while a business stays open?
Plan it in phases, keep at least one safe entrance and route open, and set out work zones in the parking area. In BC, employers must provide effective traffic control whenever traffic could be hazardous to workers, so moving vehicles are part of the plan from the start.
Sources
- Sign permit, City of Vancouver
- Sign and awning permit guidance, City of Vancouver
- Construction street use permit, City of Vancouver
- Electrical permit, City of Vancouver
- Parking By-law 6059, City of Vancouver