Contact Multigroup Contracting
Vancouver general contractor serving Metro Vancouver — commercial construction, tenant improvements, warehouse renovations, retail buildouts and multi-unit residential work.
Phone: 778-819-5933
By submitting, you agree to receive text messages from Multigroup Contracting about your enquiry. Msg & data rates may apply. Reply STOP to opt out.
Email: info@multigroup.ca
Office: Suite 700 - 838 West Hastings Street, Vancouver, BC V6C 0A6
Hours: Monday to Friday, 8:00 AM – 5:00 PM
Service area: Metro Vancouver — Vancouver, North Vancouver, West Vancouver, Burnaby, Surrey, Coquitlam, New Westminster, Richmond.
Where to reach Multigroup Contracting
Multigroup Contracting is a general contractor based at Suite 700 - 838 West Hastings Street in downtown Vancouver, British Columbia, operating since 2016. The office is open Monday to Friday, 8:00 AM to 5:00 PM Pacific time. Call 778-819-5933, email info@multigroup.ca, or send the details of your project through the quote request form on this page. Messages that arrive outside office hours are answered the next business day.
What to send with your enquiry
The faster a scope becomes clear, the faster a realistic number comes back. When you first get in touch, the most useful information is the property address, whether the space is owner-occupied or leased, the approximate square footage, the type of work involved, and the date you would like the space back in service. If an architect, designer or engineer has already produced drawings, sending the current set — even a partial or in-progress set — removes most of the guesswork from an early estimate.
Photos help as much as drawings on renovation work. A short walkthrough video of an existing suite, warehouse or storefront shows ceiling heights, existing mechanical and electrical service, floor conditions, demising walls and access constraints that no floor plan captures. For tenant work, the lease exhibit describing the landlord's work versus the tenant's work, along with any tenant improvement allowance, tells us where the budget line actually sits.
What happens after you make contact
A first conversation covers scope, site conditions, budget range and schedule. If the project is a fit, the next step is a site visit so the conditions behind the walls, above the ceiling and at the service entrance can be assessed in person. From there, the work is priced against the drawings and the assumptions written into the proposal, so you can see exactly what is included, what is excluded and where allowances have been carried.
On projects that need permits, the drawing set and the authority having jurisdiction determine the sequence. Municipalities across Metro Vancouver each run their own review process, and the City of Vancouver treats commercial alterations differently from other work. Permit strategy is discussed before pricing is finalised so the schedule reflects the approval path rather than an optimistic guess.
Types of work we take enquiries on
- Commercial construction — ground-up builds, major alterations and construction management for office, mixed-use and business environments.
- Tenant improvements — office, medical, professional and branded interiors in leased space, including landlord coordination and after-hours work in occupied buildings.
- Warehouse renovations — industrial and distribution upgrades, mezzanines, office pods inside warehouse envelopes, dock and lighting work.
- Retail buildouts — storefronts, fixtures, lighting and finishes built around customer flow and landlord design criteria.
- Coffee shop renovations — café fit-outs with espresso bars, millwork, ventilation, plumbing and back-of-house planning.
- Multi-unit residential — lobby, corridor, amenity and common-area renovations and suite turnovers for strata councils, property managers and building owners.
Emergency and urgent work
Urgent situations — water damage in a leased suite, a failed storefront, or a tenant deadline that has moved — are best raised by phone rather than email so the site can be assessed the same day where possible. Call 778-819-5933 and describe the condition, the address and the access arrangements.
Working with property managers and landlords
A large share of the work we take on sits inside buildings run by property managers. That means insurance certificates, hot work permits, elevator bookings, noise windows, hoarding requirements and building rules all form part of the schedule. Sending the building's contractor requirements package with your first enquiry avoids a round trip later, and lets the schedule reflect the hours the building actually allows work to happen.
Frequently asked questions about contacting us
How quickly do you respond? Enquiries received during business hours are typically answered the same business day; those received overnight or on weekends are answered the next business day.
Do you charge for an estimate? Initial conversations and budget-level discussions on projects within our service area are provided at no cost. Detailed pricing on complex scopes may require a completed drawing set.
What areas do you cover? Metro Vancouver, including Vancouver, Burnaby, Richmond, Surrey, Coquitlam, Port Moody, Langley, Delta, New Westminster, North Vancouver and West Vancouver. See the full list on the service areas page.
Can you work in an occupied building? Yes. Occupied-building work is planned around the tenants who stay in place, with dust control, noise windows and phased handovers written into the schedule.
Do you handle permits? Yes. Permit coordination is part of most commercial projects we deliver.
Explore before you call
If you would like context before getting in touch, the project portfolio shows the type and scale of work we deliver, and the construction blog covers permitting, buildout phases, budgeting and the practical decisions owners face on Metro Vancouver projects.
Home · Portfolio · Blog · Service Areas