Closed-cell spray foam is dense, rigid and works as both an air barrier and a vapour barrier. Open-cell foam is lighter, cheaper to apply across large cavities and stays vapour-permeable. For most commercial projects in Metro Vancouver, the choice comes down to the assembly, the BC Building Code route and how much downtime the building can absorb.
This guide is written for property managers, landlords, tenants and operators who see spray foam appear in a tenant improvement, warehouse or café scope and need to decide what to approve. It covers how the two foams differ, where each tends to fit, how permits and inspections are affected, and what it does to your schedule in an occupied building.
TL;DR
- Closed-cell foam gives roughly RSI 1.80 per 50 mm and acts as a vapour barrier at that thickness. Open-cell gives roughly RSI 0.65 per 25 mm and does not.
- Open-cell (CAN/ULC-S712.1) is often not on the prescriptive list in BC, so your team may need an Alternative Solution, which adds time.
- Plan for re-entry downtime: evaluations for medium-density closed-cell foam typically specify 25 hours with active ventilation.
- Spray foam contains isocyanates. It is professional-only work under WorkSafeBC rules, never a DIY or tenant-supplied trade.
- Settle the foam type at scoping, before the permit drawings, so it does not become a mid-project change order.
Table of Contents
- How open-cell and closed-cell foam differ
- Where each foam fits in commercial projects
- What the BC Building Code means for your foam choice
- Scheduling spray foam in an occupied building
- Application quality matters more than the label
- Budgeting spray foam in CAD
- Our perspective: decide the assembly before the drawings
- Working with Multigroup on your project
- FAQ
- Sources
How open-cell and closed-cell foam differ
Both foams are two-part polyurethane products sprayed onto a surface, where they expand and cure. Closed-cell is medium density and rigid. Open-cell is light density and semi-rigid. The difference in cell structure drives everything a project team cares about: thermal value per thickness, moisture behaviour, cost and code path.
Natural Resources Canada publishes typical values: medium-density closed-cell foam provides roughly RSI 1.80 per 50 mm, while light-density open-cell foam provides roughly RSI 0.65 per 25 mm. Per millimetre, closed-cell delivers a little more thermal resistance, which matters where depth is limited.
| Factor | Closed-cell (medium density) | Open-cell (light density) |
|---|---|---|
| Typical standard | CAN/ULC-S705.1 | CAN/ULC-S712.1 |
| Thermal value | About RSI 1.80 per 50 mm | About RSI 0.65 per 25 mm |
| Air barrier | Yes | Yes |
| Vapour barrier | Yes, at 50 mm | No, vapour-permeable |
| Feel once cured | Hard, dense, rigid | Soft, lightweight, flexible |
| Expansion | About 28 to 35 times | Up to about 100 times |
| Moisture behaviour | High moisture resistance | Absorbs and passes moisture vapour |
| BC Code path | Often aligns with prescriptive solutions | Often needs an Alternative Solution |
The expansion figures come from the same Natural Resources Canada guide. Because open-cell expands so much, it fills large, irregular cavities at a lower relative cost. Closed-cell is chosen for rigidity, moisture resistance and thermal value where space is tight.
Where each foam fits in commercial projects
Closed-cell tends to suit tight, damp or exposed locations: below-grade walls, perimeter walls with limited depth, and areas where the foam must also control vapour. Open-cell tends to suit large dry cavities where cost per square foot of coverage matters. The right call always depends on the specific assembly your design team drawings show.
Here is how that plays out in the project types we deliver.
Tenant improvements and offices
Most tenant improvements happen inside an existing shell, so insulation work is usually limited to demising walls, exterior wall pockets or a perimeter strip near glazing. Spray foam rarely covers the whole scope. Where it appears, the question is usually acoustic and thermal separation against a neighbour or the exterior. Our guide to commercial demising wall inspections in BC explains how those walls are inspected, and it is worth reading before you specify anything inside them. See also our tenant improvement services.
Warehouse and industrial renovations
Warehouses are where foam decisions carry the most dollars, because wall and roof areas are large. Open-cell’s high expansion makes it attractive for filling big cavities, but moisture exposure, condensation risk and the vapour question can push a specific wall toward closed-cell. In a conditioned warehouse with offices, mezzanines or cold-storage zones, the assembly and the heating strategy should be decided together. Details on this work are on our warehouse renovation page.
Cafés and restaurants
Kitchens and dining rooms add humidity, grease-laden air and strict health inspections. Wall and ceiling assemblies near wet areas need a clear moisture strategy, and foam is only one piece of it alongside ventilation and finishes. If you are converting a retail unit into a café, the insulation conversation belongs in the first scoping meeting, not after demolition. Our coffee shop and restaurant renovation page outlines how we sequence those conversions.
Strata and multi-family common areas
Common-area upgrades such as corridors, lobbies, parkades and amenity rooms rarely involve large foam volumes, but they are the most sensitive on occupancy. Residents live above, beside and below the work area. Isocyanate isolation, ventilation and re-entry timing become the main issues, and strata councils should expect those to be written into the schedule.
What the BC Building Code means for your foam choice
In BC, foam does not get approved by name alone. Closed-cell medium-density foam (CAN/ULC-S705.1) often aligns with the prescriptive acceptable solutions. Light-density open-cell (CAN/ULC-S712.1) is often not on that list, so your team may have to submit an Alternative Solution, which takes time and professional documentation.

The Province’s Building Code Appeal Board has dealt with this directly. In BCAB 1945, the question was whether light-density open-cell insulation in a new wood-frame Part 9 house qualified as an acceptable solution or had to be treated as an alternative one. That project was a house, not a commercial space, but it shows how open-cell foam can leave the prescriptive path. Your architect or engineer confirms which Code Part and route apply to your building.
The British Columbia Building Code 2024 sets the criteria that products and assemblies must meet rather than listing approved proprietary products. That is why documentation matters: the product’s evaluation, its installed thickness and the assembly it sits in all need to be on paper before the building official reviews it.
What to ask your design team before permit submission
- Which Building Code Part and compliance path applies to the assembly?
- Is the proposed foam on the prescriptive list, or does it need an Alternative Solution?
- Does the assembly need a separate vapour barrier, or is 50 mm of closed-cell enough?
- Who documents installed thickness and quality assurance for the inspector?
We manage City of Vancouver and municipal permits for our projects, and we raise these questions at scoping so that the permit set is complete on first submission. A foam type that triggers an Alternative Solution late in the process is one of the quieter causes of schedule slippage.
Scheduling spray foam in an occupied building
Spray foam is not a same-day trade. The work area has to be isolated and ventilated, workers need protective equipment, and nobody without protection can re-enter until the evaluated time has passed. For medium-density closed-cell foam, evaluations typically specify a 25-hour re-entry period with active ventilation. Plan that into the sequence.
The CCMC evaluation for a medium-density closed-cell product covers the re-entry and ventilation conditions. Treat the 25-hour figure as a planning baseline and confirm the exact requirement against the evaluation for the specific product your installer uses.
The reason is chemical. WorkSafeBC explains that isocyanates are released when polyurethane products such as insulating spray foams are applied, and that they can enter the body through the air and through unprotected skin. They are respiratory sensitizers. Anyone with asthma or a known sensitivity in an adjacent suite should be told in advance, and your building’s health and safety contact should be part of the notice process.
A practical sequence for occupied buildings
- Scope and notice. Confirm foam type, thickness and area. Notify neighbouring tenants or residents in writing with dates.
- Isolate. Seal the work zone, set up ventilation and exhaust routing away from air intakes.
- Apply after hours or on a weekend. This keeps the 25-hour clock from overlapping with working days for adjacent tenants.
- Hold the re-entry period. No early access for other trades, even for a quick measurement.
- Inspect and close in. Verify thickness and coverage before drywall, then schedule the inspection.
Phased or after-hours work in occupied buildings is part of what we do daily, and the foam window is simply another block on the Gantt chart. Building it in from the start costs nothing. Discovering it after tenant notices have gone out costs a week.
Application quality matters more than the label
A well-chosen foam applied badly performs badly. Improper mixing ratios or temperatures can cause poor curing, sustained off-gassing and lower thermal resistance than designed. BC’s Building Code Appeal Board decision on spray foam flags the need for on-site quality assurance, which is why your contract should name who verifies the installation.
That is also why spray foam is certified-professional work. CCMC evaluations require a quality assurance program for installers, and WorkSafeBC rules require containment, ventilation and personal protective equipment. Do not accept a tenant-supplied installer without proof of certification, and do not let foam work begin without a written safety plan.
Moisture is the other failure mode. Any product applied over or into a wall can trap water if it blocks the assembly’s drying path. A painting contractor in Ireland makes the same point for exterior coatings in this piece on avoiding trapped moisture on pebble dash. The material differs, but the principle is identical: know where moisture can leave the wall before you seal it. For foam, that means matching the product to the assembly. Open-cell stays vapour-permeable, so many assemblies need a separate vapour barrier. Closed-cell at 50 mm acts as one.

Budgeting spray foam in CAD
Foam cost depends on the area, thickness, access, foam type and the after-hours premium your building requires. We do not publish fixed prices, because the same wall can cost very differently in an open warehouse and in a fourth-floor suite with a loading restriction. Ask for a fixed scope with foam called out as its own line.
Natural Resources Canada notes that the cost per RSI is generally lower for loose-fill or batt materials than for foam products, and that high material costs may be offset by lower installation costs. For commercial budgets, the lesson is to look at installed cost across the whole assembly, not the material price alone.
When reviewing a quote, check that it separates these items:
- Foam type, thickness and square footage
- Isolation, ventilation and protective equipment
- Re-entry downtime and after-hours labour
- Permit documentation, including any Alternative Solution package
- Quality assurance and thickness verification
- Closing the wall: framing, drywall and finishing
A quote that lumps everything into a single number hides the items most likely to change. A quote that breaks them out lets you compare properly and lets us hold the price.
Our perspective: decide the assembly before the drawings
We are a commercial general contractor, not a foam manufacturer, so we have no product to push. What we see on site is that foam problems are scoping problems. They start when insulation is treated as a late line item and surface as a permit comment, a re-entry delay or a tenant complaint.
Our approach is to put the assembly on the table at the first walkthrough. We ask what the wall must do: control vapour, save depth, add acoustic separation, or simply fill a cavity. We then confirm the Code path with the design team, line up certified installers, and write the 25-hour clock and the notice process into the schedule. Self-performing and managing the whole project means one accountable contractor holds those dependencies together, so property managers do not have to coordinate them.
We also say no when it helps. If a simpler assembly meets the Code and the budget, we say so, even when it is less work for us. That is what fixed scope and clear schedules mean in practice.
— MultigroupTeam
Working with Multigroup on your project
Multigroup Contracting delivers tenant improvements, office fit-outs, retail and restaurant buildouts, warehouse renovations and strata common-area work across Metro Vancouver. We are licensed, insured ($5M liability, WorkSafeBC) and manage permits, BC Building Code compliance and prime contractor duties.
If spray foam is in your scope, start with our commercial construction services, then contact us with your address, floor plan and target dates. We will confirm the assembly, the permit path and the schedule before you commit. You can also see recent work in our portfolio.
FAQ
Which is better for a commercial space, open-cell or closed-cell foam?
Neither wins everywhere. Closed-cell gives more thermal resistance per millimetre and acts as a vapour barrier at 50 mm, so it suits tight or damp assemblies. Open-cell fills large dry cavities at lower relative cost but is vapour-permeable. Your design team should choose based on the specific assembly and Code route.
Does open-cell foam need an Alternative Solution in BC?
Often, yes. Light-density open-cell foam (CAN/ULC-S712.1) is frequently not on the prescriptive list, so a project may need an Alternative Solution with supporting documentation. Confirm with your architect or engineer and the local building department before ordering, because it can add time to permitting.
How long must a space stay empty after spray foam is applied?
For medium-density closed-cell foam, CCMC evaluations typically specify a 25-hour re-entry period with active ventilation. The exact requirement depends on the product and its evaluation. Your contractor should confirm it in writing and schedule around it.
Can a tenant or handyman install spray foam?
No. Spray foam releases isocyanates, which can cause serious respiratory sensitization, and WorkSafeBC requires containment, ventilation and protective equipment. Use a certified professional installer, and ask for proof of certification and a written safety plan before work begins.
Sources
- Keeping The Heat In, Section 3: Materials (Natural Resources Canada)
- BCAB 1945: Insulation material, acceptable or alternative solution (Province of British Columbia)
- British Columbia Building Code 2024 (Province of British Columbia)
- CCMC 13697-L evaluation (National Research Council Canada)
- Isocyanates (WorkSafeBC)