For most commercial projects in Metro Vancouver, the answer is not one or the other. Heat-welded sheet vinyl suits washrooms, clinical rooms and wet areas. Luxury vinyl tile (LVT) suits retail floors, reception and dining rooms. The better question is which zone each product serves, what the slab needs first, and how the install fits your building.

Multigroup
Plan Flooring Within the Full Fit-Out
Multigroup delivers commercial tenant improvements across Metro Vancouver, including clinic, retail, restaurant and office fit-outs.
Explore commercial fit-outs

TL;DR

  • Sheet vinyl is the usual choice for clinics, washrooms and janitorial rooms because seams can be heat-welded into a continuous surface. LVT is the usual choice for retail, offices and dining areas where look and tile-by-tile repair matter.
  • Installed costs in Canada run roughly $9 to $16 per square foot for heat-welded sheet vinyl and $7 to $14 for commercial LVT. Slab preparation often moves the total more than the product does.
  • In Vancouver, swapping flooring alone generally needs no building permit. Moving walls, plumbing or electrical does.
  • Plan for cure and traffic wait times, and for WorkSafeBC coordination when several trades share the site.

Table of Contents

How to choose between sheet vinyl and LVT by zone

Choose by what each room has to do. Sheet vinyl wins where moisture control and cleanability come first. LVT wins where appearance, modular repair and heavy foot traffic matter. Most tenant improvements end up with both, split along room function rather than one product for the whole floor.

A practical way to scope it is to walk the floor plan and label every room as wet, clinical, public-facing or back-of-house.

Zone Usual fit Why
Clinic treatment rooms, washrooms Sheet vinyl Seamless, heat-welded construction limits places for bacteria and moisture to collect
Retail sales floor, reception LVT Design range and tiles that can be replaced individually
Restaurant dining area LVT Warm, durable look; see our restaurant and café buildouts
Janitorial and break rooms Sheet vinyl Easy cleaning and sanitation
Open office areas Often carpet tile Neither vinyl product is required

The BC government’s own technical standards for office tenant improvements show the same logic. They schedule carpet tile for open and private offices and call for resilient flooring in areas such as break rooms, reception and janitorial rooms. Advice from other commercial flooring suppliers agrees that segmenting by zone extends lifespan and reduces maintenance problems.

If you are a landlord filling several units, set a base-building standard per room type. It keeps turnovers predictable and spare stock manageable.

What each option does well and where it falls short

Sheet vinyl gives the fewest seams and the best moisture control, but a damaged section means cutting out and re-welding a larger area. LVT repairs tile by tile, but every joint is a seam. Neither is better in general. Each fails differently when it is poorly installed.

Sheet vinyl

  • Comes in wide rolls, so a washroom or treatment room can be covered with few seams, and those seams are heat-welded.
  • Suits healthcare and wet rooms. Professional-grade products are designed to give a continuous, impervious surface for sanitation.
  • Seam welding is skilled work. A poor weld is the usual point of failure.
  • Repairing a gouge in the middle of a room is harder than replacing one tile.

Luxury vinyl tile

  • Offers wood, stone and concrete looks, which matters for brand-driven retail and hospitality.
  • Individual tiles can be swapped if a pallet jack, a dropped tool or a leak damages them. Keep spare boxes from the same dye lot.
  • Many tile joints mean more places for water to reach the subfloor if a room floods or is mopped heavily.
  • Needs a flat, well-prepared slab. Telegraphing of slab defects through the tile is a common complaint on poorly prepared floors.

Product lifespan depends heavily on how the floor is looked after. Manufacturer guidance on polish-free maintenance for PUR-reinforced vinyl points out that the cleaning regime affects lifecycle cost, which many owners overlook when they compare only the purchase price.

What commercial vinyl flooring costs in Vancouver

What commercial vinyl flooring costs in Vancouver — overview diagram

Across Canada, commercial flooring costs $5 to $18 per square foot installed. Heat-welded sheet vinyl lands at $9 to $16 and commercial LVT at $7 to $14. Vancouver projects sit higher once scope, access and after-hours work are included, and the slab is often the biggest variable.

That same source cites a Vancouver range of approximately $15.68 to $31.36 per square foot for commercial resilient flooring, depending on project scope. Treat it as a planning band, not a quote. What moves a project within it:

  • Surface preparation. Grinding, patching and self-levelling are frequently the largest line item in a commercial flooring quote. BC slabs often need work to reach the flatness tolerance that either product requires.
  • Moisture testing. Manufacturers may void warranties when concrete moisture exceeds their threshold, so testing before you order is cheaper than a failed floor.
  • Demolition and disposal. Removing old adhesive-bonded flooring takes time, and older buildings raise the question of hazardous materials (see below).
  • Phasing. Working in sections, at night or on weekends costs more per square foot than a vacant suite, but it can protect rent and trading revenue.
  • Transitions, coves and details. Sheet vinyl coved up a wall in a clinic is more labour than a straight LVT field.

A worked example

Take a 2,000 sq ft medical office with six treatment rooms and two washrooms totalling 600 sq ft, with reception and corridors making up the other 1,400 sq ft. Using the national installed ranges above, 600 sq ft of sheet vinyl is about $5,400 to $9,600, and 1,400 sq ft of LVT is about $9,800 to $19,600. That is roughly $15,200 to $29,200 for flooring supply and install before slab prep, demolition, permits or phasing. These figures are arithmetic on a published range, not a Multigroup quote. Your actual number depends on a site walk and a moisture test.

Installed flooring cost ranges by material

Our own guide to avoiding 15 to 25% extra on commercial flooring covers where those overruns come from in Metro Vancouver buildings.

Permits and code: when flooring triggers paperwork

In Vancouver, replacing flooring on its own generally does not require a building permit. A permit becomes mandatory when the work moves interior walls, plumbing or electrical lines. Because most tenant improvements bundle flooring with other changes, plan on permits for the project, even if the flooring is not the trigger.

The City of Vancouver lists when you need a permit, including changing the land use of an existing commercial space. A café conversion from retail, or a clinic fit-out in former office space, can fall under that. Two City programs are worth knowing:

  • The Tenant Improvement Program (TIPs) is a dedicated stream for office tenants in eligible buildings, meant to speed up permits for minor renovations. If your project does not qualify, it follows the standard process.
  • The Commercial Renovation Centre offers small business owners help understanding City requirements before they commit to a space.

Outside Vancouver, Burnaby, Surrey, Coquitlam, North Vancouver and Langley each run their own permit rules, so confirm with the municipality before assuming a flooring-only job is exempt. BC Building Code requirements, such as slip resistance in certain spaces and finish requirements for healthcare or food premises, are set per use. A health authority may also review food service and clinical premises. Your contractor should confirm these before the product is ordered, not after it arrives.

Scheduling the install in an occupied building

A typical commercial floor needs a prepared slab, a controlled install and a wait before traffic. Light foot traffic is usually allowed after about 24 hours, and rolling or heavy loads after 48 to 72 hours, per manufacturer technical guidance. Build the schedule around those windows, not around the install alone.

In a live building, sequencing usually looks like this:

  1. Site review and moisture testing. Done before ordering, so material is matched to the slab.
  2. Product and adhesive confirmation. Commercial jobs need adhesives approved by the flooring manufacturer for the substrate. This is where low bids often cut corners.
  3. Demolition and prep in phases. Dust and noise control, protected paths and agreed work hours with the property manager.
  4. Install and seam welding. Sheet vinyl needs precise welding. LVT needs consistent layout and acclimatization.
  5. Cure and handover. Keep carts, pallet jacks and furniture off the floor for the stated wait time.

For tenants who trade during the work, our guide to keeping your business open during a Metro Vancouver commercial renovation covers phasing, access and communication with neighbours.

Safety and prime contractor duties

WorkSafeBC treats commercial interior renovation as a high-hazard classification for safety planning, and coordination on multiple-employer sites falls to the prime contractor. Even a flooring-only phase can have several trades on site. Owners should know who holds that role. We explain it in WorkSafeBC prime contractor duties for owners.

If the building is older, check for asbestos in existing floor tiles and adhesives before demolition. Our note on asbestos notice requirements in Metro Vancouver renovations outlines what property managers need to do first.

Our perspective: scope the floor as part of the whole project

We rarely see a flooring decision fail because someone picked the wrong product family. It fails because the slab was not tested, the schedule ignored cure time, or nobody owned the coordination between trades. We treat flooring as one line in a fixed scope, not a standalone purchase.

On our projects, that means a few habits:

  • We split the floor plan by room function first, then specify. A clinic gets sheet vinyl where hygiene drives the choice, and a retail front gets LVT where presentation does.
  • We ask for slab moisture results and flatness findings before the quote is fixed, so prep does not appear as a change order later.
  • We hold permits, BC Building Code compliance and WorkSafeBC prime contractor duties under one accountable contractor. We are licensed and insured, with $5M liability coverage.
  • We schedule around your tenants, your opening date or your rent roll, including phased and after-hours work in occupied buildings.

A common mistake we see from property managers is approving the cheapest square-foot price without asking what is excluded. Grinding, adhesive, transitions, and protection of adjacent finishes are the usual gaps. Ask for them to be listed.

— MultigroupTeam

Working with Multigroup on your flooring scope

We deliver flooring as part of commercial fit-outs and renovations across Metro Vancouver, with one contractor managing permits, trades and schedule. If you are planning a clinic, café, retail unit, office or warehouse, we can walk the space, define scope by zone and give you a fixed-scope plan.

Start with the service closest to your project:

Or contact us with your address, drawings if you have them and your target dates. See our portfolio for similar work. For wider upgrade planning, read our commercial interiors upgrade guide for BC owners.

FAQ

Is sheet vinyl better than vinyl plank for commercial use?

Neither wins everywhere. Sheet vinyl is better in wet and clinical rooms because of its heat-welded seams. Vinyl plank and tile are better where appearance and tile-by-tile repair matter, such as retail and dining. Most projects use both, divided by room function.

What are the disadvantages of sheet vinyl?

It depends on skilled seam welding, and a damaged area is harder to repair invisibly than a single tile. Lower-grade products can also be more vulnerable to damage. Choose commercial-grade material and a qualified installer, and keep the slab flat and dry.

Which is better for a commercial washroom, LVT or sheet vinyl?

Sheet vinyl is the usual choice because it can form a continuous, moisture-resistant surface with few joints. LVT can work in a washroom if the tile joints are well sealed and the slab is dry, but sheet vinyl gives fewer places for water to get through.

Do I need a permit to replace commercial flooring in Vancouver?

Generally not for a flooring swap alone. A permit is required if the work involves moving interior walls, plumbing or electrical, per the City of Vancouver. Other municipalities set their own rules, so check before you start.

How long before a new vinyl floor can be used?

Manufacturer guidance typically calls for about 24 hours before light foot traffic and 48 to 72 hours before rolling or heavy loads. Follow the specific product’s technical sheet, because adhesives and conditions vary.