Type X drywall is gypsum board with a glass-fibre-reinforced core, made for fire-rated assemblies. Regular drywall is not. In a Metro Vancouver commercial project, the fire separation drawn on your permit set decides which board goes where, and the board is only one part of that assembly. Thickness alone does not make a wall fire-rated.

This guide is for property managers, landlords, strata councils and tenants scoping a fit-out or renovation. It explains what separates the boards, how Type C fits in, how 5/8-inch and 1/2-inch board differ, and how we verify what goes on the wall before a sheet is hung.

Multigroup
Keep Rated Walls to the Approved Assembly
Multigroup delivers commercial fit-outs and manages permits and BC Building Code compliance across Metro Vancouver and the Lower Mainland.
Visit Multigroup

TL;DR

  • Type X has a fibre-reinforced core that resists cracking and crumbling in a fire. Regular board can shrink, crack and fall apart under heat.
  • Whether you need Type X is set by the BC Building Code and your approved drawings, not by the board’s thickness or by preference.
  • Type C is an enhanced proprietary Type X. It is listed only in specific tested assemblies, so it is not a drop-in swap.
  • The rating belongs to the whole assembly: framing, board type, thickness, fasteners, joints and penetrations.
  • Ask your contractor which assembly is on the permit drawings and keep the product data and inspection records on file.

Table of Contents

What Type X drywall is, and how it differs from regular board

Type X is gypsum board engineered for fire-rated walls and ceilings. Its core contains glass fibres that hold the board together as it heats. Regular board has the same basic chemistry but lacks that reinforcement, so it fails sooner. The difference is mechanical: how the panel behaves while it burns.

All gypsum board resists fire to a degree, because the core holds chemically combined water that has to be driven off before the board heats through. Fire-rated drywall differs in how it holds together afterwards: Type X contains glass fibres that help it resist crumbling, while regular drywall can shrink, crack and fall apart under excessive heat.

An engineer’s technical article makes the same point. A 5/8-inch regular gypsum panel exposed to 1850°F fails in 10 to 15 minutes, and the physical failure comes from shrinkage and cracking. The glass fibres in Type X reduce that cracking. That article dates from 1983, so treat it as an explanation of the mechanism, not a current rating.

On site, the two boards are handled alike. Type X and Type C are installed, scored and finished with the same methods as standard panels. The risk is not in the hanging. It is in the wrong board ending up in the wrong place, or the right board being fastened and jointed differently from the tested assembly.

When a commercial project calls for Type X

Type X is required where the code requires a fire separation or fire-resistance rating and the approved assembly specifies it. In commercial work that usually means demising walls between tenants, corridor and exit enclosures, shaft walls, and some ceilings. Your drawings and the BC Building Code decide each location.

Fire separations are meant to contain a fire long enough for people to get out and for fire crews to arrive. Assemblies can be rated through ULC testing, code-accepted assemblies, or Appendix D calculations. In British Columbia, a required rating must be determined in conformance with an approved construction in the BC Building Code or other approved tested assemblies.

In practice, we see Type X come up in these places on tenant improvements and renovations:

  • Demising walls between tenant suites, where the wall may need a fire-resistance rating and an acoustic target as well. Our guide to commercial demising wall inspections in BC covers how these walls are checked.
  • Corridor, stair and elevator enclosures that a change of use or a new occupancy load can bring into play.
  • Walls separating different occupancies, such as a new café or clinic beside an office.
  • Warehouse and industrial partitions, where a new office or lunchroom is built inside a larger fire compartment.

A change of use is the usual trigger. A tenant moving from storage to a restaurant, or from office to a clinic, can change which separations the code requires. We raise this during scoping, before pricing, so the fire-rated scope is in the budget and the permit application instead of appearing as a change order. For the wider compliance picture, see our BC Building Code compliance guide.

Thickness: 5/8-inch, 1/2-inch and the metric numbers

Thickness helps, but it does not set the rating. In Canadian documents you will see 12.7 mm (1/2 inch) and 15.9 mm (5/8 inch). The BC Building Code tables list both thicknesses of Type X, as well as regular board, in assemblies with different fire-resistance ratings.

The 2018 BC Building Code fire and sound resistance tables show 12.7 mm and 15.9 mm Type X gypsum board alongside regular gypsum board in wall assemblies. So a 1/2-inch panel is not automatically “non-rated,” and a 5/8-inch panel is not automatically “rated.” Some sources say Type X typically comes in 5/8-inch thickness, which is common on site, but the tables are what a designer checks.

The assumption we hear most is that any 5/8-inch board will do. It will not. Regular 5/8-inch board and 5/8-inch Type X look identical stacked in a pile. Fire-rated board carries its classification on the panel, and the designer’s assembly names the type as well as the thickness.

Question Regular board Type X Type C
Core Standard gypsum core Glass-fibre-reinforced core Type X with added shrinkage-compensating additives
Typical use Non-rated walls and ceilings Rated assemblies where the listing names Type X Only assemblies where Type C is specifically listed
Thicknesses in BC tables or product data 12.7 mm and 15.9 mm in code tables 12.7 mm and 15.9 mm in code tables 12.7 mm and 15.9 mm for CGC Firecode C
Field handling Standard Same scoring and finishing methods Same scoring and finishing methods

Type X vs Type C

Type C is an enhanced version of Type X, with added additives that keep the core stable at high temperatures. It is proprietary, so it is listed only in specific tested assemblies. You cannot swap it for Type X by default, and you cannot assume it is accepted in generic code assemblies.

CGC describes its Firecode C panels as enhanced proprietary Type X panels in 12.7 mm and 15.9 mm thicknesses, usable in any listed design where Type C panels appear. The additives include materials such as vermiculite that let the board stay stable even after the water in the core has been driven off, as the engineer’s article above explains.

There is a code wrinkle. Under the 2010 and 2015 National Building Code, Type C is not recognized in Appendix D or in the generic assemblies for smaller buildings, which limits it to specific ULC-tested assemblies. Those generic assemblies allow any brand of board, provided the thickness and the Type X classification match the code section. Check the edition that applies to your permit, because BC adopts and amends its own code.

A manufacturer’s white paper shows the gap in a lab comparison: Type C resisted fire for over two hours against 57 minutes for Type X under the same conditions. That is a manufacturer’s test of its own products, so use it to understand the difference, not to substitute one board for the other. When the drawings call for Type C, we price and install Type C. When they call for Type X, upgrading is a conversation with the designer and the building official, not a field decision.

Type X vs Type C — overview diagram

Why the assembly matters more than the board

A fire rating applies to a complete system, not to a panel. The framing, board layers, fasteners, joint treatment, insulation and every penetration are part of what was tested. Change one and you may no longer have the tested assembly.

The standard test, CAN/ULC-S101, evaluates an assembly as a complete system and gives a relative measure of fire endurance, not an absolute time of protection in a real fire. A manufacturer says the same: certification does not guarantee one-hour protection in an actual fire, because results depend on the whole system and the quality of construction. Designers also need to confirm that the assembly explicitly permits the chosen board type and thickness.

On tenant improvements, these are where rated walls usually go wrong:

  1. Penetrations. Pipes, conduit and ducts through a rated wall need firestopping that matches the assembly. Trades arriving after the drywallers often cut holes without it.
  2. Walls stopped at the ceiling grid. A rated wall must run to the deck or to a rated ceiling, as the design shows. A wall that ends at a suspended tile ceiling does not do the job.
  3. Mixed board. Regular board mixed into a rated wall to use up stock is a failure waiting for an inspector.
  4. Added acoustic layers. Sound upgrades such as resilient channel or clips change the assembly. See our note on resilient channel versus sound clips in commercial work before you add either to a rated wall.
  5. Unfinished joints and gaps. Board edges, corners and perimeter gaps must be treated as the listing requires.

How to verify what is on your wall

Check three things: the approved drawings, the marking on the board, and the listing or design number. For an existing wall, the permit drawings are the first stop. Behind finished walls, nobody can confirm the board type reliably by eye.

For a new build or renovation, we work through this sequence:

  1. Read the fire separation schedule on the permit drawings. It names each rated wall, the rating and the assembly design.
  2. Match the product to the listing. Board carries a classification and type designation. For example, CGC Firecode C panels have the UL type designation printed on the face along the long edge, and for fire-rated use you refer to the published UL design or GA file number. The same data sheet notes cUL classification for fire resistance under Canadian standards.
  3. Photograph before closing. Framing, board layers, fasteners and firestopping are photographed before the final layer or finish goes on.
  4. Coordinate inspections. Rated assemblies are inspected before they are covered, so the schedule has to allow for it.
  5. Keep a record. Delivery slips, product data and photos go to the owner’s file at handover. A future tenant or insurer may ask.

For existing buildings with unknown walls, ask your designer or a fire protection engineer. Do not open, cut or alter a wall assumed to be rated without that review. In older buildings, also check for asbestos-containing materials before demolition. In Metro Vancouver that can add a notice period and testing to your timeline, which we cover in our guide to asbestos notice for property managers.

Cost and scheduling: what to expect in the budget

Type X is a distinct product from regular board, so it should be a separate line in your estimate. The cost difference depends on the quantity of rated wall, board thickness and layers, the framing, firestopping, inspections and access in an occupied building, not on the sheet price alone.

We do not quote a single dollar-per-sheet figure here, because board pricing changes and an installed price depends on the assembly. What drives the number on a Metro Vancouver project:

  • Layers. Many rated assemblies use two layers of board on one or both sides, which doubles the board and the finishing labour on that wall.
  • Framing and insulation. The assembly may specify stud gauge, spacing and insulation, so the rated wall is more than a board swap.
  • Firestopping. Every penetration is its own detail and inspection item.
  • Access. After-hours or phased work in an occupied building changes labour costs more than the board does.
  • Inspection timing. A missed inspection window can hold up the trades behind it.

The best way to control cost is to pin down the rated scope early. A fixed scope with each rated wall identified on the drawings produces an estimate that holds. A vague “drywall allowance” does not.

Our perspective: treat rated walls as a system, from the first walkthrough

We self-perform and manage tenant improvements, warehouse renovations and strata work inside occupied buildings across Metro Vancouver. On those projects, fire-rated drywall has rarely been the hard part. The hard part is that nobody owns the question “which walls are rated, and to what assembly?” until late.

Our approach is to put that question on the table at the first walkthrough. We mark every rated wall on the drawings, price it as a separate line, confirm the assembly with the designer, and plan inspections into the schedule before framing starts. We keep rated and non-rated board stored and labelled separately on site, and we photograph before we close walls. As a licensed contractor with $5M liability coverage and WorkSafeBC compliance, we also coordinate the trades that follow the drywallers, because they are the ones who cut through rated walls.

Our advice to property managers: do not let a rated wall be a surprise on the permit or in the budget. Ask your GC to show you the fire separation schedule and the product data for each assembly before demolition starts.

— MultigroupTeam

Planning a tenant improvement with rated walls

If your project involves demising walls, corridor enclosures or a change of use, we can scope the fire-rated work with the rest of the buildout, manage the City permit and keep the schedule realistic in an occupied building. Our tenant improvement service covers office, retail, clinic and restaurant fit-outs, and our commercial construction team handles larger renovations.

Multigroup

For industrial space, our warehouse renovation work includes new offices and partitions within existing fire compartments. To talk through your drawings, contact us.

FAQ

When should I use Type X drywall?

Use Type X where the approved drawings and the BC Building Code call for a fire-resistance rating, such as demising walls, exit enclosures and shaft walls. The assembly design names the board type and thickness. Confirm with your designer instead of choosing by room type.

How do I know if I have Type X drywall?

Look for the classification and type designation printed on the board, and check the delivery documents and product data. Behind a finished wall, the permit drawings are the reliable record. If they are missing, ask a designer or fire protection engineer to review before anything is cut or altered.

Is 5/8-inch drywall the same as Type X?

No. Thickness is one factor, but a 5/8-inch board can be regular or Type X. The BC Building Code tables list Type X in both 12.7 mm and 15.9 mm, and also regular board in some assemblies. The design for the wall names the type and thickness.

Is Type C better than Type X?

Type C performs better in some lab tests, but it is proprietary and listed only in particular tested assemblies. It is not a generic substitute for Type X in code-prescribed assemblies. Use whatever the approved assembly names, and raise any change with your designer first.

Does Type X cost more than regular drywall?

Expect to price it as a separate line, since it is a distinct product, but the installed cost depends on layers, framing, firestopping, inspections and site access as much as on the board. We quote it against your drawings rather than from a generic per-sheet figure.