Occupant load & water closet calculator
Add each area of the space, pick its use from the BC Building Code table, and see a first estimate of the occupant load and the minimum number of water closets. Use it to plan before a lease or a design, then confirm with your designer and the building department.
The interactive tool loads with JavaScript. The guidance it uses is below.
What the calculator does, and what it does not
- Occupant load. For each area, the net floor area is divided by the area per person in BC Building Code 2024, Division B, Table 3.1.17.1. The calculator rounds each area up to the next whole person; the code does not state a rounding rule. Under Article 3.1.17.1, the load is the number of persons the area is designed for, but not less than the table value unless it can be shown that fewer people will use it. Spaces with fixed seats use the seat count instead.
- Water closets. The load is split equally between males and females, as Sentence 3.7.2.2.(1) assumes, and the count for each sex is read from Table 3.7.2.2.-A (assembly), Table 3.7.2.2.-B (business and personal services), Sentence 3.7.2.2.(11) (mercantile) or Table 3.7.2.2.-C (industrial).
- Not included: universal or accessible washrooms (Section 3.8), lavatories (Article 3.7.2.3), urinal substitution, Part 9 buildings (Section 9.31), exits and fire alarm thresholds, patios, and any municipal amendments.
BC Building Code vs the Vancouver Building By-law
Most of Metro Vancouver applies the BC Building Code 2024. The City of Vancouver applies its own Vancouver Building By-law 2025. The City says Book I is substantially based on the 2024 BC Building Code with Vancouver-specific provisions, and Book II (Plumbing Systems) is based on the 2020 National Plumbing Code with Vancouver options. The City also uses its own occupant load forms. Results can differ. This calculator uses the BC Building Code 2024 values only. For a space in the City of Vancouver, check the Vancouver Building By-law and ask the City.
Table 3.1.17.1 values used (BC Building Code 2024)
| Use (Table 3.1.17.1) | Area per person, m² |
|---|---|
| Assembly: Dining, beverage and cafeteria space | 1.20 |
| Assembly: Space with non-fixed seats and tables | 0.95 |
| Assembly: Space with non-fixed seats | 0.75 |
| Assembly: Standing space | 0.40 |
| Assembly: Classrooms | 1.85 |
| Assembly: Reading or writing rooms or lounges | 1.85 |
| Assembly: Bowling alleys, pool and billiard rooms | 9.30 |
| Business and personal services: Offices | 9.30 |
| Business and personal services: Personal services shops | 4.60 |
| Mercantile: Mercantile: basements and first storeys | 3.70 |
| Mercantile: Mercantile: second storey with a principal entrance from a pedestrian thoroughfare or parking area | 3.70 |
| Mercantile: Mercantile: other storeys | 5.60 |
| Industrial: Manufacturing or process rooms | 4.60 |
| Industrial: Storage spaces (warehouse) | 28.00 |
| Other uses: Kitchens | 9.30 |
| Other uses: Storage | 46.00 |
| Other uses: Cleaning and repair of goods | 4.60 |
Spaces with fixed seats: the number of seats (Clause 3.1.17.1.(1)(a)).
Water closet rules used (BC Building Code 2024, Article 3.7.2.2)
- Assembly, Table 3.7.2.2.-A (persons of each sex: male, female): 1–25: 1, 1 · 26–50: 1, 2 · 51–75: 2, 3 · 76–100: 2, 4 · 101–125: 3, 5 · 126–150: 3, 6 · 151–175: 4, 7 · 176–200: 4, 8 · 201–250: 5, 9 · 251–300: 5, 10 · 301–350: 6, 11 · 351–400: 6, 12 · over 400: male 7 plus 1 for each additional 200 males over 400; female 13 plus 1 for each additional 100 females over 400.
- Business and personal services, Table 3.7.2.2.-B (for each sex): 1–25: 1 · 26–50: 2 · over 50: 3, plus 1 for each additional 50 persons of each sex over 50.
- Mercantile, Sentence 3.7.2.2.(11): at least 1 for each 300 males and 1 for each 150 females. Sentence 3.7.2.2.(14) lets a mercantile suite of 500 m² or less use Table 3.7.2.2.-B based on the total number of staff only.
- Industrial, Table 3.7.2.2.-C (for each sex): 1–10: 1 · 11–25: 2 · 26–50: 3 · 51–75: 4 · 76–100: 5 · over 100: 6, plus 1 for each additional 30 persons of each sex over 100. Sentence 3.7.2.1.(2) lets intermittently occupied industrial floor areas be based on staff only.
- Small spaces, Sentence 3.7.2.2.(2): both sexes may share a single water closet when the occupant load is not more than 10 (assembly, business, mercantile and industrial occupancies, among others).
Related guides
- Occupant load calculation in BC: a guide for commercial spaces
- Washroom fixture count in BC commercial buildings
- Accessible washrooms in BC
- Part 3 vs Part 9 in the BC Building Code
- Commercial permit path finder for Vancouver
Frequently asked questions
Which code edition does the calculator use?
The BC Building Code 2024, Division B: Table 3.1.17.1 for occupant load and Article 3.7.2.2 for water closets. It does not apply the Vancouver Building By-law or any other municipal requirements.
Does the result replace a code review?
No. It is a first estimate for planning. A registered professional or your designer confirms the occupant load and the plumbing fixture count, and the building department decides.
Does the calculator include accessible washrooms?
No. Universal and accessible washroom requirements are in Section 3.8 of the BC Building Code and are not calculated here.
Sources
- Province of BC: British Columbia Building Code 2024, Revision 1, Division B, Article 3.1.17.1 and Table 3.1.17.1; Subsection 3.7.2
- City of Vancouver: Vancouver Building By-law
- City of Nanaimo: Occupant load calculations for restaurants and take-outs (a municipal example applying Table 3.1.17.1)
Disclaimer: This calculator is general information, not code advice or a code review. It may not reflect the code edition, amendments or interpretations that apply to your building. Do not use it to set a posted occupant load or to design plumbing. Confirm with a registered professional and the authority having jurisdiction.