Commercial permit path finder
Moving a business into a Vancouver commercial space or planning interior work? Answer the questions below to see which City of Vancouver permit route your project is most likely on. It is a planning aid, not a City decision.
The interactive tool loads with JavaScript. The guidance it uses is below.
The four routes, in plain language
Most commercial projects inside the City of Vancouver fall into one of four routes. The tool above asks the questions that separate them. Each answer below links to the City page it comes from.
1. A change of use that needs no development or building permit
The City no longer requires a development permit or a building permit for a straightforward change between five business types when the space is under 300 m² (about 3,229 sq ft): general office, health care office, retail store, barber shop or beauty salon, and beauty and wellness centre. The City asks you to have the proposed location checked by its Development and Building Services Centre before you lease, as part of the business licence. If you also plan construction, that work can still need a permit.
2. TIPs: the Tenant Improvement Program for office tenants
TIPs is a dedicated stream for minor interior renovations by office tenants in commercial office buildings on the City's TIPs list. Any commercial office building built under a building permit applied for after January 31, 2007 is included automatically. TIPs projects do not need a new development permit and get an expedited field review. Work that is not eligible includes changes in major occupancy, mezzanines and other floor area additions, most exterior alterations, interconnecting floors, upgrades to existing systems, fire alarms, sprinkler systems or seismic work, and assembly occupancies that increase occupant load, affect exiting or include kitchen or washroom work. Moving or adding up to 20 sprinkler heads is handled with a sprinkler permit by the sprinkler contractor.
3. A standard building permit
If the space is not in a TIPs building, the tenant is not an office, or the scope includes items TIPs excludes, plan for a standard building permit. Trade permits (plumbing, electrical, gas and fire sprinkler) are applied for separately, usually by the trade contractors.
4. A development permit and a building permit
A development permit is generally added when the zoning side changes: a new use that is not an outright use in the zoning district (and is not covered by the change-of-use exemptions), additions to the building, or most exterior alterations. Zoning and Development By-law clause 4.8.1(n) lists the changes of use that are exempt.
TIPs building list (addresses)
These are the addresses on the City of Vancouver TIPs list as published on the City's Tenant Improvement Program page, checked November 29, 2026. Being on the list does not make a particular project eligible; the City reviews each application. Always confirm the current list with the City.
- 34 W 7th Ave (Completed)
- 823-843 Seymour St (Completed)
- 550 Burrard St (Completed)
- 1669 E Broadway St (Completed)
- 2750 E Hastings St (Completed)
- 825 Homer St (Completed)
- 669 Howe St (Completed)
- 507 W Broadway (Completed)
- 128 W Cordova St (Completed)
- 830 W Hastings St (Completed)
- 400 Terminal Ave (Completed)
- 1618 Quebec St (Completed)
- 1077 Gt Northern Way (Completed)
- 800 Griffiths Way (Completed)
- 745 Thurlow St (Completed)
- 980 Howe St (Completed)
- 725 Granville St (Completed)
- 520 W Georgia St (Completed)
- 564 Beatty St (Completed)
- 1075 W Hastings St (Completed)
- 488 Terminal Ave (Completed)
- 558 W Broadway (Completed)
- 988 W Broadway (Completed)
- 4899 Heather St (Completed)
- 510 Seymour St (Completed)
- 475 Howe St (Completed)
- 400 SW Marine Dr (Completed)
- 380 W 5th Ave (Completed)
- 775 Richards St (Completed)
- 22 E 5th Ave (Completed)
- 565 Gt Northern Way (Completed)
- 401 W Georgia St (Completed)
- 275 W 5th Ave (Completed)
- 1410 Granville St (Completed)
- 753 Seymour St (Completed)
- 601 W Hastings St (Completed)
- 1575 W Georgia St (Completed)
- 512 W Broadway (Completed)
- 525 W 8th Ave (Completed)
- 35 W 6th Ave (Completed)
- 2200 Yukon St (Completed)
- 110 W 5th Ave (Completed)
- 102 E 4th Ave (Completed)
- 1055 Vernon Dr (Completed)
- 688 W 57th Ave (Completed)
- 320 Granville St (Completed)
- 1070-1090 W Pender St (Completed)
- 155 Water St (Completed)
- 3333 Bridgeway (Completed)
- 1488 Robson St (Completed)
- 58 W Hastings St (Completed)
- 3664 Cornett Rd (Completed)
- 950 Granville St (Completed)
- 225 Smithe St (Completed)
- 1133 Melville St (Completed)
- 349 W Georgia St (Completed)
- 1550 Alberni St (Under construction)
- 1280 Burrard St (Completed)
- 400 W Georgia St (Completed)
- 1296 Station St (Under construction)
- 2102 Keith Dr (Under construction)
- 425 W 6th Ave (Completed)
- 151 W 5th Ave (Under construction)
- 375 E 1st Ave (Under construction)
- 855 Granville St (Under construction)
- 1261 Hornby St (Under construction)
- 234 W 3rd Ave (Completed)
- 150 W 4th Ave (Completed)
- 1717 Lorne St (Under construction)
- 8690 Barnard St (Under construction)
- 1055 W Georgia St (Under construction)
- 485 W 42nd Ave (Under construction)
- 2665 Renfrew St (Under construction)
- 1166 W Pender St (Under construction)
- 399 E 1st Ave (Under construction)
- 1221 E 2nd Ave (Under construction)
- 2122 Quebec St (Under construction)
- 650 W 41st Ave (Under construction (major project office))
- 658 W 41st Ave (Under construction (major project office))
- 688 W 41st Ave (Under construction (major project office))
- 5931 Cambie St (Under construction (major project office))
Related guides
- Tenant improvement permits in Vancouver, including TIPs
- Tenant improvement permit checklist for Vancouver
- Commercial building permits in Vancouver, explained
- Occupancy permits in Vancouver
- Commercial building permits in Burnaby
- Vancouver commercial renovation permit data by space type
- Occupant load and water closet calculator
Frequently asked questions
Does this tool tell me whether I need a permit?
No. It shows the route your answers most likely point to, based on City of Vancouver pages. Only the City can confirm what your project needs. Ask the Development and Building Services Centre before you sign a lease or start work.
Which business types can change use without a permit in Vancouver?
General office, health care office, retail store, barber shop or beauty salon, and beauty and wellness centre, when the space is under 300 m² and both uses are permitted in the zoning district. Construction work can still need its own permit.
How do I know if my building is on the TIPs list?
Search the address in the tool above or in the list on this page, then confirm on the City of Vancouver TIPs page. Commercial office buildings with a building permit applied for after January 31, 2007 are included automatically.
Does the tool work outside the City of Vancouver?
No. TIPs and the change-of-use exemption are City of Vancouver programs. Burnaby, Richmond, Surrey and other Metro Vancouver cities have their own permit processes.
Sources
- City of Vancouver: Tenant Improvement Program (TIPs), including the TIPs building list and what is not eligible
- City of Vancouver: Apply for a business licence (check a location before you lease; the five business types under 300 m²)
- City of Vancouver: Zoning and Development By-law, Section 4, clause 4.8.1(n) (changes of use that do not need a development permit)
- City of Vancouver: Permitting and licensing improvements memo, June 2, 2026
- City of Vancouver: Small business Commercial Renovation Centre
Disclaimer: This page is general information, not legal or code advice, and it is not a decision by the City of Vancouver. Rules change. Confirm your project with the City of Vancouver before you rely on any result.