When a tenant improvement adds enclosed meeting rooms to an open office floor, each new room becomes its own small space that needs its own air, sprinkler coverage, lighting, power and data, sound control and a code-compliant door. Walls are the easy part. The work is in making sure everything the open floor used to share still reaches the room once it is closed in, and that the change goes through landlord approval and the right permit.
This guide is for office tenants, landlords and property managers planning meeting rooms, boardrooms, focus rooms and collaboration spaces in Vancouver and elsewhere in Metro Vancouver. Mechanical, electrical and sprinkler work is designed by engineers and carried out by trade contractors, coordinated by the general contractor. For the layout and exiting side of new walls, see our guide to office partition layouts that pass permit review.
Does every collaboration space need walls?
Not always. Start by sorting the meetings your team actually holds:
- Enclosed meeting rooms and boardrooms: confidential calls, client meetings and video conferences that need privacy.
- Small focus or call rooms: one or two people on calls, away from open desks.
- Open collaboration areas: quick team huddles, a large table or soft seating at the edge of the open floor.
Open areas leave the ceiling, air and sprinkler layout largely as they are. Every enclosed room adds coordination for the trades and for the permit drawings, so it pays to enclose only the rooms that truly need privacy. See our guide to planning an office tenant improvement in Vancouver for the wider brief.
Where should enclosed rooms go on the floor?
Location shapes almost everything that follows. Settle these with your designer and the landlord early:
- Window wall or interior? Rooms along the windows take daylight from the open floor, while interior rooms near the core keep it for desks. Partitions that meet the window wall have to connect where the landlord's building standards allow.
- Near existing services? Rooms placed under existing ductwork, sprinkler mains and ceiling space with room to work are simpler to serve than rooms squeezed under crowded ceilings.
- Clear of exit routes: new rooms must not block the path to exits. The partition layout guide covers corridors, travel distance and exits.
How will a closed meeting room stay comfortable?
On an open floor, air moves freely between zones. Once a room is closed in, it may be cut off from the supply and return air that served that area, and a full room adds a lot of people to a small space.
WorkSafeBC requires workplace ventilation to be balanced so each space receives an adequate allotment of outdoor air for its actual or normally anticipated occupancy, and requires an indoor air quality investigation when occupancy changes substantially or renovations significantly change the ventilation system. The BC Building Code sets outdoor air for new work using the ASHRAE 62.1 ventilation standard. In practice, a mechanical engineer reviews each new room and decides how the base building system will supply, return and control air there, within the landlord's rules for the base building equipment. Mechanical trade contractors carry out that work.
Two coordination points to raise early: the return air path, since a sealed room needs a way for air to leave, and temperature control, since a room that shares a thermostat with the open floor can run warmer than the area around it when it is full.
What changes for sprinklers, alarms and lighting?
- Sprinklers: walls and a ceiling can block coverage from the existing heads, so the sprinkler designer checks whether heads must be added or moved. In Vancouver, any change to sprinkler system piping requires a fire sprinkler permit. On TIPs projects, a sprinkler coverage inspection is part of the building permit inspection, and a sprinkler contractor can apply for a permit to move or add up to 20 heads.
- Fire alarm and exit signs: the designer checks whether the new rooms change where alarm devices, exit signs and emergency lights need to be, since the City's minor renovation permit checklist asks for them on the floor plans.
- Lighting: each room usually gets its own lighting and controls, so people can dim lights for screens. The electrical engineer confirms what the applicable energy requirements call for.
What do glass fronts and doors need?
Glass fronts keep meeting rooms bright and visible, but glass and doors carry specific rules. Under the BC Building Code 2024:
- Markings: fully glazed transparent doors, sidelights and panels need visually contrasting markings or mullions at least 50 mm high, across their full width, between 1 350 mm and 1 500 mm above the floor. WorkSafeBC also requires glass panels that could be mistaken for a doorway to be marked.
- Safety glazing: a glass door must be laminated or tempered safety glazing, or wired safety glass, to the referenced standards.
- Vision glass: where doors or sidelights have vision glass, its lowest edge must be no higher than 900 mm above the floor.
- Accessible doors: a doorway on an accessible path of travel needs at least 850 mm of clear width, clear space beside the latch side of the door, a level clear floor area on each side, and door hardware operable between 900 mm and 1 100 mm above the floor.
In Vancouver, the Vancouver Building By-law applies instead of the provincial code, so your designer confirms the matching Vancouver requirements.
How do you keep meeting rooms private and connected?
A closed door is not the same as a private room. Whether conversations stay inside depends on wall height, the ceiling, door seals and how penetrations are sealed. Our guide to acoustic planning for office fit-outs covers partition height, ceilings and sealing, so plan it before walls are framed.
Meeting rooms also need more power, data and audio-visual support than a desk: a screen wall with blocking inside the studs to carry the display, outlets and data at the table, and a clear path for cables to the network room. See our guide to power and data planning for an office tenant improvement.
Which approvals apply in Vancouver, Burnaby and Richmond?
- Landlord: most leases require landlord approval of drawings before work starts, including any work on base building air, sprinkler and fire alarm systems. See our guide to landlord approval for a commercial fit-out.
- Vancouver: the City lists moving interior walls and tenant improvements to commercial space among the work that generally needs a permit. In an office building on the City's TIPs list, a minor interior renovation can use the TIPs building permit stream. TIPs is not available for assembly occupancies that increase occupant load or impact exiting, or for projects that upgrade existing systems, fire alarms or sprinkler systems, so a large training room may need a standard building permit.
- Burnaby: the City's tenant improvement permit guide says alterations to the interior layout of an existing commercial building need a building permit, and trade permits are obtained after the building permit is issued. See our guide to commercial building permits in Burnaby.
- Richmond: commercial interior alterations need a tenant improvement building permit, and the City's tenant improvement bulletin notes that sprinkler work may need plans when 5 or more new heads are added or 13 or more are relocated, and that major changes to the heating and ventilating layout may need a registered professional.
If the rooms raise the number of people the floor is designed for, check exits and washrooms with our guide to occupant load calculation in BC. The full drawing set is covered in our guide to office tenant improvement drawings.
What should you settle before the drawings are issued?
- Which spaces are enclosed and which stay open, and how many people each room is meant to hold.
- Room locations checked against exits, windows, the core and existing ductwork and sprinkler mains.
- The mechanical engineer's approach to air supply, return and temperature control in each room.
- Sprinkler, fire alarm, exit sign and lighting changes shown on the drawings.
- Glass front details: markings, safety glazing and door clearances.
- Acoustic targets, screen and camera locations, power and data at the table.
- Landlord approval and the permit path for your city.
How Multigroup Contracting helps
Multigroup Contracting is a commercial general contractor and fee-based construction manager with our Vancouver office at 700-838 West Hastings St. Founded in 2016, we are registered with WorkSafeBC and carry $5M in liability insurance. When an office layout adds meeting rooms, we review the plan with your designer, bring the mechanical, electrical and sprinkler engineers and trade contractors in early, coordinate their work with the landlord's building standards, and sequence framing, rough-in, inspections and glazing so each room is complete before it is closed in. We build tenant improvements and office fit-outs in Vancouver and across Metro Vancouver, including Burnaby and Richmond.
Planning meeting rooms or collaboration spaces for an office in Vancouver or Metro Vancouver? Get a free quote, call Multigroup Contracting at 778-819-5933 or email info@multigroup.ca.
FAQ
Does adding meeting rooms to an open office need a permit in Vancouver?
Generally, yes. The City of Vancouver lists moving interior walls and tenant improvements to commercial space among the work that needs a permit. In an office building on the City's TIPs list, a minor interior renovation can use the City's TIPs building permit stream, and sprinkler, electrical and other trade permits follow once the building permit is issued.
Will a new meeting room need its own sprinkler heads?
Often. Walls and a ceiling can block coverage from the existing heads, so the sprinkler designer checks whether heads must be added or moved. In Vancouver any change to sprinkler piping needs a fire sprinkler permit, and on a TIPs project a sprinkler contractor can apply for a permit to move or add up to 20 heads.
Why do enclosed meeting rooms get stuffy?
A closed room holds many people in a small space, and walls cut it off from the air that served the open floor. WorkSafeBC requires ventilation to be balanced so each space gets an adequate share of outdoor air for its normally anticipated occupancy. A mechanical engineer decides how the base building system serves each new room.
Do glass meeting room walls and doors need markings?
Yes, in most cases. The BC Building Code requires fully glazed transparent doors, sidelights and panels to carry visually contrasting markings at least 50 mm high across their full width, between 1 350 mm and 1 500 mm above the floor, and glass doors must be safety glazing.
How wide should a meeting room door be?
Where the door is on an accessible path of travel, the BC Building Code calls for a clear opening of at least 850 mm, clear space beside the latch side of the door and a level clear floor area on each side. In Vancouver, your designer confirms the matching Vancouver Building By-law requirements.
Sources
- When you need a permit, City of Vancouver
- Tenant Improvement Program (TIPs), City of Vancouver
- Get a fire sprinkler permit, City of Vancouver
- Field Review and TIPS Minor Renovation Building Permit Application Requirements (checklist), City of Vancouver
- Vancouver Building By-law, City of Vancouver
- BC Building Code 2024, Province of British Columbia
- OHS Regulation Part 4, General Conditions (glass, indoor air quality), WorkSafeBC
- Tenant Improvement Permits Informational Guide, City of Burnaby
- Commercial building permit requirements, City of Richmond
- Bulletin Info-13, Tenant Improvement Process, City of Richmond