An office partition layout passes permit review when every private office, meeting room and open area keeps a clear path to the exits, the new occupant load is supported by enough exit capacity and washrooms, and the drawings show all of it in the way the City asks for. In Vancouver, adding or moving interior walls in a commercial space generally needs a building permit, so plan the partitions around exits, occupant load and building systems first, then fit the furniture.

This guide is for office tenants, landlords and property managers in Vancouver and Metro Vancouver. For the math behind the numbers, see our guide to occupant load calculation in BC; for space per person, see office space planning standards.

Do you need a permit to add or move office partitions in Vancouver?

In most cases, yes. The City of Vancouver lists renovation projects that include moving interior walls, and renovating or tenant improvements for a new or existing commercial space, among the work that generally needs a permit. New offices, meeting rooms and storage rooms all mean new or moved walls and doors.

Partition work also touches power, lighting, exit signs, fire alarm devices and sprinkler heads. The City notes that most construction is likely to require separate trades permits, such as plumbing, electrical, gas and fire sprinkler, typically submitted by the trade contractors hired by the general contractor. If you are not sure whether a specific change needs a permit, the City asks you to contact its Development and Building Services Centre.

What does the City look for in an office floor plan?

The City's submission checklist for minor renovations and TIPs applications is a good picture of what reviewers expect. Among other items, the floor plans must show:

  • The existing and proposed layout, with the outside dimensions and total area of the tenant space.
  • The dimensions and uses of all rooms and areas, including the existing and proposed use and occupancy.
  • The layout of furniture, shelving and counters.
  • All door sizes and corridor widths.
  • Exiting for the tenant space and for all other tenant spaces on the floor where work is happening.
  • New or existing washrooms, including fixtures.
  • All exit signs, emergency lights and fire alarm pull stations.

The same checklist asks for a Vancouver Building By-law analysis on the plans, the fire-resistance rating of any required fire separations, and firestopping details where services pass through them. Drawings are generally at 1:50 in vector PDF; hand-drawn sketches and scanned drawings are not accepted. Our guide to office tenant improvement drawings covers the full drawing set.

A layout that only shows desks and walls is not a permit layout. Exit paths, door sizes and life-safety devices have to be planned and drawn from the start.

How do private offices and meeting rooms affect exits?

Every wall you add changes how people get out. When your designer lays out rooms, they check:

  • A clear route from every room: each private office, meeting room and work area needs a path to an exit that the by-law accepts. Routes that pass through another office, a storage room or a kitchen are worth flagging early.
  • Corridor widths and door sizes: corridors created by a row of offices must stay wide enough for the people they serve.
  • Travel distance and dead ends: a long corridor lined with offices, with only one way out, can push the farthest room too far from an exit.
  • Existing exits: new walls must not block or hide exit doors, exit signs or the route to the exit stairs. On a shared floor, the plans must show other tenants' exiting still works.
  • Fire separations: corridors and some rooms may need to be rated fire separations, and doors in them need the matching rated assemblies.

Our guide to fire and life safety in commercial renovations explains how exits, fire separations and rated doors shape a layout. If your plan includes a new wall that splits one suite into two tenancies, that wall is a demising wall with its own requirements; see our guide to commercial demising walls.

How does the layout change the occupant load?

Occupant load follows how each area is used. Turning open desks into a large boardroom, training room or lunch room can raise the design number of people, which drives exit capacity, door hardware, washroom fixtures and sometimes the fire alarm.

In Vancouver, an occupant load permit sets the maximum number of people who can safely use a gathering space, and an assembly space designed for more than 60 people needs one. Vancouver Fire Rescue Services' memorandum to occupant load permit applicants lists the exiting items it looks at, including the number of exits, exit width and capacity, door swing direction where the occupant load exceeds 60, panic hardware where it typically exceeds 100, and travel distance and exit access. Your designer confirms whether a large room counts as an assembly space.

If the layout adds people, check washrooms early with our guide to washroom fixture counts in BC.

What happens to sprinklers, alarms and lighting when new walls go up?

New rooms change how the building systems cover the space:

  • Sprinklers: a new wall or ceiling can block sprinkler coverage, so heads may need to move or be added. In Vancouver, any change to sprinkler system piping requires a fire sprinkler permit, and the sprinkler contractor applies for it. On TIPs projects, the City notes that a sprinkler coverage inspection is part of the building permit inspection.
  • Fire alarm and exit signs: new rooms and corridors can change where alarm devices, exit signs and emergency lights need to be, which is why the City asks for them on the floor plans.
  • Heating and ventilation: enclosed rooms change how air reaches each space. The landlord's requirements and a mechanical engineer decide how the base-building systems serve the new layout, and specialist trades carry out that work.
  • Sound: full-height walls and ceiling choices affect privacy between offices. Our guide to acoustic ceiling tile vs drywall covers the ceiling side.

Will your layout qualify for TIPs or need a standard permit?

Work on existing buildings in Vancouver falls under Part 11 of the Vancouver Building By-law. The City's Notes to Part 11 describe a minor renovation as work within a single suite and its shared demising walls, and list reconfiguration of the interior space of the suite as minor renovation work. Your designer or code consultant confirms the category.

The City's Tenant Improvement Program (TIPs) is a dedicated building permit stream for office tenants in eligible commercial buildings doing minor interior renovations. The building must be on the City's TIPs list. TIPs is not available for assembly occupancies that increase occupant load, impact exiting, or include work to kitchens or bathrooms, for changes in major occupancy, for most major renovations, or for projects that upgrade existing systems, fire alarms or sprinkler systems. If the project does not qualify, it needs a standard building permit.

Either way, the work is inspected at stages through to a final inspection, and the City requires an occupancy permit before occupying commercial space after major renovations, a change of use or when new space is created. Our tenant improvement permit guide covers the application. Elsewhere in Metro Vancouver, the 2024 BC Building Code applies, including its accessibility requirements, and each municipality runs its own permit process.

What should you settle before the layout goes to permit?

Spanning two units? See combining adjacent commercial suites.

How Multigroup Contracting helps

Multigroup Contracting is a commercial general contractor and fee-based construction manager with our Vancouver office at 700-838 West Hastings St. Founded in 2016, we are registered with WorkSafeBC and carry $5M in liability insurance. When you are planning a new office layout, we review the plan with your designer for exits, occupant load and building systems, coordinate the consultants and trades, and work through landlord approval, permits and inspections. We build tenant improvements and office fit-outs across Metro Vancouver.

Planning new offices, meeting rooms or a re-partition in Vancouver or Metro Vancouver? Get a free quote, call Multigroup Contracting at 778-819-5933 or email info@multigroup.ca.

FAQ

Do I need a permit to add or move office partitions in Vancouver?

Generally, yes. The City of Vancouver lists renovations that move interior walls and tenant improvements to commercial space among the work that needs a permit. Electrical and sprinkler changes need their own trade permits. If you are unsure, the City asks you to contact its Development and Building Services Centre.

Can a new office layout go through the City's TIPs program?

It can if the office is in a building on the City's TIPs list and the work is a minor interior renovation. Projects that upgrade fire alarm or sprinkler systems, change the major occupancy, or fall into the other excluded scopes need a standard building permit instead.

Does a large boardroom or training room need an occupant load permit?

It depends on how the room is classified. In Vancouver, an assembly space designed for more than 60 people needs an occupant load permit from Vancouver Fire Rescue Services, so a large training or event room should be reviewed by your designer early.

Do new office walls affect the sprinklers?

Often. A new room can block sprinkler coverage, so heads may need to move or be added. Any change to sprinkler system piping needs a fire sprinkler permit in Vancouver, and the sprinkler contractor applies for it.

What happens if the layout changes after the permit is issued?

Talk to your designer before building it. The City has an amendment process for issued building permits, and changes to exits, rooms or sprinklers may need revised drawings and review.

Sources