Restaurant Buildouts
Multigroup Contracting builds out restaurants and cafes in Vancouver and across Metro Vancouver as a commercial general contractor or fee-based construction manager, from the signed lease through City of Vancouver permits and Vancouver Coastal Health plan review to opening day. We work on second-generation restaurant units and on retail or office spaces being converted to food service, and we keep the designers, engineers and specialist kitchen trades on one schedule. Kitchen ventilation and other mechanical scopes are designed by the project's engineers and installed by specialist trades that we coordinate; we do not self-perform that work. Registered with WorkSafeBC, $5M insured and 11 years in business. Get a free quote
What is a restaurant buildout, and what does it involve?
A restaurant buildout is the construction that turns a commercial unit into a working food premises: a kitchen and back of house, a dining room or bar where the concept needs one, food-safe finishes, washrooms and accessibility, and the City and health approvals needed before opening. It is a tenant improvement with a food-premises health review on top.
Scope follows the menu and the base building. A small cooking line in a second-generation restaurant unit is a different job from a full-service restaurant built in a retail unit or office space that never had a kitchen. The City notes that existing kitchens may only have been approved for food that does not create greasy fumes, so a new menu can mean new kitchen ventilation and fire protection work under a building permit. That is why the equipment list belongs at the start of design.
From lease to opening day: how a restaurant buildout runs in Vancouver
- Before you sign the lease. The City advises checking the proposed location with its Development and Building Services Centre before you lease or buy space. At the same time, check drainage and grease interceptor options, gas and electrical capacity, where kitchen exhaust could run, washrooms and accessibility, and the landlord's rules for work hours and penetrations.
- Scope and budget. Price from the equipment list and the gaps in the base building, and put the split between landlord's work and tenant's work in writing.
- Drawings. Architectural drawings, the kitchen equipment layout and the engineered plumbing, electrical, mechanical and fire protection design the permits require.
- Vancouver Coastal Health floor plan review. Floor plans must be reviewed and approved by Vancouver Coastal Health before construction begins. Submit them alongside the City applications, not after.
- City permits. A development permit where one is required, then the building permit. A building permit must be issued before any work can begin. Trade permits for plumbing, gas, electrical and fire sprinklers follow.
- Construction and City inspections. Demolition, framing, trade rough-ins and inspections, finishes and equipment setting, then the final building inspection. An occupancy permit may also be needed to occupy the space.
- Health approval and opening. The operator submits the food service permit application, menu, food safety and sanitation plans and FOODSAFE Level 1 certification, and an Environmental Health Officer inspects the premises against the approved floor plan before health approval is given.
- Handover. A joint walk-through, a written deficiency list and close-out documents: warranties, equipment manuals and as-built records.
What permits and approvals does a restaurant need in Vancouver?
- Business licence. All businesses in Vancouver need one. As part of the review, City staff check the location against land-use and life safety rules, and Vancouver Coastal Health inspects and reviews food-related businesses.
- Development permit, where required. Needed where zoning relaxations or particular land uses are proposed, and, according to the City, when a food establishment goes into a new building or one that never had a commercial kitchen.
- Building permit. Construction and any change of use or occupancy on private property needs one. The City also reviews and inspects commercial kitchen ventilation and fire protection systems under a building permit.
- Trade permits. Plumbing, gas, electrical and fire sprinkler permits, typically submitted by the trade contractors.
- Vancouver Coastal Health. Floor plan approval before construction, a food service permit application, and the pre-opening inspection.
- Others as the concept needs. Sign permits for exterior signs, a sidewalk or patio permit, and a liquor licence for liquor-serving businesses are separate approvals.
Building and health reviews run on separate tracks with different reviewers. Confirm current requirements with the City and Vancouver Coastal Health for your address before you fix an opening date. Outside Vancouver, Burnaby, Richmond, Surrey, the North Shore and the other Metro Vancouver municipalities each run their own permit process, and the regional health authority for that city reviews the food premises.
Opening a cafe in Vancouver: which permits you need and who handles them
A new cafe in Vancouver typically needs a City business licence, a building permit with the related trade permits, and Vancouver Coastal Health floor plan approval and a food service permit, and the work is split between the operator, the design team and the contractor.
- The operator applies for the business licence and the health permit, and supplies the menu, the food safety and sanitation plans and FOODSAFE Level 1 certification that Vancouver Coastal Health asks for.
- The design team prepares the floor plan for health review and the drawings for the building permit.
- The contractor and its trades build to the approved plans; trade permits are typically submitted by the trade contractors hired by the general contractor, and the contractor books the inspections.
Cafes are not among the five business types the City lists for its faster location-change process for spaces under 300 m² (general office, health care office, retail store, barber shop or beauty salon, and beauty and wellness centre), so plan for the standard reviews. Small espresso-only cafes and full cafe kitchens are different jobs; see our coffee shop renovations page for cafe-specific scope.
What drives the cost of a restaurant buildout?
No prices here, only the things that move a food-service budget most:
- What the space was before. A second-generation restaurant with usable drainage, an interceptor and an exhaust route usually needs less work than a retail or office space that never had a kitchen.
- The menu and equipment. Cooking that produces grease-laden vapours brings kitchen ventilation and fire protection requirements; the equipment list sets the plumbing, gas and electrical loads.
- Underground plumbing. New drainage or a grease interceptor can mean cutting the slab; upper-floor units add routing work.
- Electrical and gas capacity. The base building may not have the service a kitchen needs.
- Washrooms and accessibility. Alterations commonly bring accessible washroom upgrades.
- Occupied buildings. Landlord rules on work hours, shutdowns and deliveries.
What affects the schedule?
Approvals and long-lead equipment usually set the calendar more than construction days. Projects move faster when the space was already a food premises, the equipment list is final before drawings are issued, health and City submissions go in together, and kitchen equipment and refrigeration are ordered early. They move slower when a shell needs new drainage and an exhaust route, a development permit is needed, the landlord restricts roof or wall penetrations, or the menu changes after the plans are approved, since Vancouver Coastal Health requires revised plans to be resubmitted.
Working in an occupied plaza or building
Many Metro Vancouver restaurants sit in plazas, food halls and mixed-use buildings that stay open. Expect hoarding to the landlord's standard, dust and noise control, set delivery routes and hours, freight bookings, and shutdowns of sprinkler, fire alarm, gas or water booked with building operations. Exits, alarms and sprinklers stay live for neighbouring tenants throughout.
Why Multigroup for a restaurant buildout
Multigroup Contracting is a Vancouver commercial general contractor with 11 years in business. We are registered with WorkSafeBC and carry $5M liability insurance, and our office is at Unit 700, 838 West Hastings Street, Vancouver. For restaurants and cafes we offer general contracting (one contract, we manage the trades) and fee-based construction management (owner-side cost advice, tendering and cost tracking while design is still moving). We work across Vancouver, Burnaby, Richmond, Surrey, the North Shore and the rest of Metro Vancouver.
Common mistakes, and what to check before signing
- Signing a lease before confirming with the City that food service is allowed at the address.
- Leasing a retail or office space without checking drainage, gas, electrical capacity and an exhaust route.
- Finalising the equipment list after the engineering design is done.
- Treating health approval as a final inspection instead of a floor plan review before construction.
- Leaving accessible washroom requirements out of the budget.
- An unclear split between landlord's work and tenant's work.
Before signing a construction contract, confirm the written scope, who supplies, installs and connects each piece of equipment, who submits each permit and health application, the after-hours rules, the change-order process and the close-out documents.
Frequently asked questions
Who builds out restaurants and cafes in Vancouver?
Multigroup Contracting, a commercial general contractor based at Unit 700, 838 West Hastings Street in Vancouver, builds out restaurants and cafes across Metro Vancouver as general contractor or fee-based construction manager. The company is registered with WorkSafeBC, carries $5M liability insurance and has been in business for 11 years. It coordinates the City permits, the Vancouver Coastal Health plan review and the specialist kitchen trades from lease to opening day. Call 778-819-5933 or use multigroup.ca/contact.
What permits does a restaurant need in Vancouver?
Most restaurants in Vancouver need a City business licence, a building permit, trade permits for plumbing, gas, electrical and fire sprinklers as the work requires, a sign permit for exterior signs, and Vancouver Coastal Health floor plan approval and a food service permit. A development permit can also be required, for example when a food establishment moves into a new building or one that never had a commercial kitchen. A liquor licence is a separate process for liquor-serving businesses.
Do I need Vancouver Coastal Health approval before building a restaurant?
Yes. Vancouver Coastal Health states that floor plans must be reviewed and approved before construction begins, for new premises, renovations and alterations. Before opening, an Environmental Health Officer inspects the premises to confirm it was built to the approved floor plan and meets food safety and sanitation standards.
What permits do I need to open a cafe in Vancouver, and who handles them?
A new cafe in Vancouver typically needs a City business licence, a building permit with the related trade permits, and Vancouver Coastal Health floor plan approval and a food service permit. The operator applies for the business licence and the health permit and supplies the menu, the food safety and sanitation plans and FOODSAFE Level 1 certification. The design team prepares the drawings, and trade permits are typically submitted by the trade contractors hired by the general contractor. Multigroup coordinates the drawings, permits and inspections as GC or CM.
Does a restaurant need a development permit in Vancouver?
Sometimes. The City says a food establishment going into a new building, or into an existing building that never had a commercial kitchen, needs a development permit. A separate development permit is also needed where zoning relaxations or particular land uses are proposed. When one is required, it comes before the building permit, so check with the City's Development and Building Services Centre before you sign a lease.
What happens between signing a restaurant lease and opening day?
The usual order is: confirm with the City that food service is allowed at the address, review the space against the menu and equipment, prepare drawings, get Vancouver Coastal Health floor plan approval and the City permits, build and pass the City inspections, then pass the Vancouver Coastal Health pre-opening inspection and finish the business licence. Changes to the approved plans have to be resubmitted to the health authority.
Can a restaurant be built while the rest of the building or plaza stays open?
Yes, and in Metro Vancouver it is common. Noisy work is scheduled within landlord rules and the City noise bylaw, the unit is hoarded and sealed, deliveries follow building rules, and shutdowns of shared services are booked with building operations so neighbouring tenants keep trading.
What is the difference between a restaurant buildout and a coffee shop buildout?
Both are food premises and need City permits and Vancouver Coastal Health approval. A restaurant usually has a larger cooking line, dining room and bar, so there is more kitchen trade work to coordinate. A coffee shop is usually smaller, with plumbing and power concentrated behind the counter. For cafes, see our coffee shop renovations page at multigroup.ca/services/coffee-shop-renovations.
Should I hire a general contractor or a construction manager for a restaurant buildout?
Choose general contracting when the design and equipment list are settled and you want one firm responsible for the budget, schedule and trades. Choose fee-based construction management when the design is still moving and you want cost and buildability advice before trades are priced. Multigroup Contracting offers both; our general contractor vs construction manager guide explains the difference.
How do I start a restaurant or cafe buildout enquiry with Multigroup?
Call 778-819-5933 or request a quote at multigroup.ca/contact. Our office is at Unit 700, 838 West Hastings Street, Vancouver, and is open 9 to 5. Send the address, the menu or kitchen concept, any drawings or landlord criteria you have, and whether you want to discuss general contracting or fee-based construction management.
Official sources
- Vancouver Coastal Health: food service permits and health approvals
- City of Vancouver: apply for a business licence
- City of Vancouver: get a development permit
- City of Vancouver: get a building permit
- City of Vancouver: building permits for restaurant kitchen ventilation and fire protection
Related reading
- Restaurant buildout contractors in Vancouver
- Cafe buildout cost in Vancouver: budget guide
- Warm shell vs cold shell: what tenants and landlords get
- Landlord work letter for a tenant improvement in Vancouver
- Commercial building permits in Vancouver, explained
- General contractor vs construction manager in Vancouver
Related services
- Coffee shop renovations
- Retail buildouts
- Tenant improvements
- Commercial construction
- Request a quote
How do I get a project priced?
Send the scope, the address and any drawings you already have to info@multigroup.ca, call 778-819-5933, or use the quote request form. Multigroup Contracting has operated as a general contractor out of Suite 700 - 838 West Hastings Street in Vancouver since 2016, and works across Metro Vancouver including Vancouver, Burnaby, Richmond, Surrey, North Vancouver, West Vancouver, Coquitlam and New Westminster.
Home · About · Portfolio · Blog · Service Areas · Contact
Related services: Suite Turnovers · Multi-Family Suite Renovations · Commercial Construction · Tenant Improvements · Office Fit-Outs · Warehouse Renovations · Retail Buildouts · Coffee Shop Renovations