An office kitchenette or break room is one of the few parts of a commercial office buildout that brings water, drainage and sometimes exhaust into an otherwise dry office floor. In Vancouver, that usually means a plumbing permit alongside the tenant improvement building permit, a location close to the building's existing drain and water connections, a clear decision on whether any cooking needs exhaust, and protection against leaks into the floor below. Settle those assumptions before the design is fixed.
This guide is for office tenants, landlords and property managers planning a kitchenette, coffee point, lunchroom or staff break room as part of a commercial tenant improvement in Vancouver and elsewhere in Metro Vancouver. Plumbing, exhaust and electrical work is designed by engineers and designers and carried out by the appropriate trade contractors, coordinated by the general contractor.
What makes a kitchenette different from the rest of an office fit-out?
Most of an office fit-out is walls, ceilings, lighting, power, data and finishes. A kitchenette adds a sink, often a dishwasher, water lines to a fridge, coffee machine or water dispenser, and appliances that need their own power. Each one connects to base building systems the landlord controls, so a small amenity space can need more coordination than a much larger open area.
Where can the kitchenette go on the office floor?
Location drives most of the plumbing work. A sink needs a drain that slopes to the building's sanitary system, a vent and a water supply. In a multi-storey office building, those connections usually run in risers near the core and the washrooms.
- Near the core: a kitchenette placed close to existing risers keeps drain runs short and simple.
- Along the window wall: a break room with daylight is popular, but long drain runs may need work through the slab or in the ceiling of the floor below, which involves the landlord and possibly another tenant.
- Existing rough-ins: some second-generation offices already have a kitchenette or capped plumbing. Reusing that location is often the easiest path, if the existing piping is in good condition.
Confirm the location with your designer and the landlord before the layout is fixed. Our guide to landlord approval for a commercial fit-out covers what landlords usually review.
What plumbing does an office kitchenette usually need?
A typical staff kitchenette includes a sink, a dishwasher, water to a fridge, ice maker or coffee machine, and a source of hot water.
The BC Building Code 2024 applies its plumbing part to the design, construction, extension and alteration of plumbing systems, and requires them to conform to the BC Plumbing Code (Book II of the Building Code, based on the National Plumbing Code). In Vancouver, the Vancouver Building By-law Book II (Plumbing Systems) applies, with Vancouver-specific requirements.
In Vancouver, you need a plumbing permit to install, change or upgrade any part of a plumbing system. Repairing or replacing a fixture in the same location does not need one. The City also lists moving existing plumbing and tenant improvements to commercial space among the work that generally needs a permit. For permit steps, see our guide to plumbing permits in Vancouver.
Does an office kitchenette need an exhaust hood?
It depends on what people will cook. The BC Building Code requires ventilation systems for commercial cooking equipment to conform to NFPA 96, the standard for commercial cooking operations. An explanatory note in the Code, written for assembly and care buildings, says equipment used mainly for reheating food prepared elsewhere is not expected to need NFPA 96 treatment, while equipment producing much more grease-laden vapour than light everyday cooking should be, with the authority having jurisdiction reviewing each case.
For a typical office kitchenette with a microwave, kettle and coffee machine, the question is usually odour control rather than a commercial hood. The Building Code also says air contaminants should be removed as far as possible at their source. A mechanical engineer decides whether the room needs its own exhaust and how it connects to the base building system, within the landlord's rules.
Adding a range, a cooktop or a catering kitchen changes the project. Vancouver's commercial renovation permit checklist asks for mechanical plans that include kitchen exhaust hood and duct work, and a kitchen exhaust form when a commercial kitchen is added or renovated. For that kind of space, see our guide to restaurant kitchen ventilation requirements.
How do you protect the floor and the tenant below from water?
Office floors are not usually built as wet areas, and a leak from a kitchenette can reach the ceiling of the suite below. Raise these assumptions early with your designer, engineers and landlord:
- What is below? Another tenant or a lobby changes how much protection the landlord expects.
- Landlord standards: many buildings have rules for wet areas, such as flooring, sealed edges, leak detection or a waterproofing membrane under the kitchenette.
- Shutoffs and supply lines: accessible shutoff valves, and supply lines to dishwashers, fridges and coffee machines specified and connected by the plumbing trade.
- Finishes: water-resistant flooring, countertops and backsplashes, with joints sealed at the sink and appliances. Our guide to commercial office flooring covers flooring choices by room.
WorkSafeBC also requires floors used by workers to be kept free of slipping and tripping hazards, so the floor finish in a break room matters for day-to-day safety as well as for leaks.
What power, data and safety details matter in a break room?
- Power: fridges, dishwashers, microwaves and coffee machines can each need their own circuit. The electrical designer sets the circuits, and the electrical trade contractor carries out the work under its own permit. See our guide to power and data planning for an office tenant improvement.
- Accessibility: where the break room is on an accessible path of travel, the BC Building Code calls for a door with at least 850 mm of clear width, and your designer checks the layout against the Code's accessibility requirements.
- Eating areas: WorkSafeBC requires employers to provide a suitable area for storing and eating food when food could become unwholesome because of workplace contaminants, or when eating is restricted in the workplace.
- Glass fronts: the marking and safety glazing rules in our guide to adding meeting rooms to an office buildout apply here too.
Which permits apply in Vancouver, Burnaby and Richmond?
- Vancouver: a building permit for the tenant improvement and a plumbing permit for new or changed plumbing. The City's commercial renovation checklist asks for plumbing plans when plumbing changes are in the scope, and for a plumbing Schedule B from a registered professional in a Part 3 building. See our guide to commercial building permits in Vancouver.
- Burnaby: the City's tenant improvement permit guide says alterations to the interior layout of an existing commercial building, and installing or modifying a commercial kitchen exhaust system, need a building permit. Plumbing and other trade permits follow once the building permit is issued.
- Richmond: the City's tenant improvement bulletin says plans, permits and inspections are required when plumbing fixtures are removed or new ones are added, with plumbing plans showing drains, vents and water piping sized to the BC Plumbing Code. The City's commercial permit page also asks for plumbing fixture locations on the floor plan.
The full drawing set is covered in our guide to office tenant improvement drawings.
What should you confirm before the drawings are issued?
- How the space will be used: coffee and reheating only, or real cooking.
- The kitchenette location checked against existing drain, vent and water risers.
- Every fixture and appliance that needs water, drainage or power.
- The mechanical engineer's approach to exhaust and odour control.
- Leak protection, shutoffs and finishes agreed with the landlord, including what is on the floor below.
- Landlord approval and the building and plumbing permit path for your city.
How Multigroup Contracting helps
Multigroup Contracting is a commercial general contractor and fee-based construction manager with our Vancouver office at 700-838 West Hastings St. Founded in 2016, we are registered with WorkSafeBC and carry $5M in liability insurance. When an office layout includes a kitchenette or break room, we review the plan with your designer, bring the plumbing, mechanical and electrical engineers and trade contractors in early, coordinate their work with the landlord's building standards, and sequence rough-in, inspections, millwork and finishes so the space is ready for the team. We build tenant improvements and office fit-outs in Vancouver and across Metro Vancouver, including Burnaby and Richmond.
Planning an office kitchenette or break room in Vancouver or Metro Vancouver? Get a free quote, call Multigroup Contracting at 778-819-5933 or email info@multigroup.ca.
FAQ
Do I need a plumbing permit to add an office kitchenette in Vancouver?
In most cases, yes. The City of Vancouver requires a plumbing permit to install, change or upgrade any part of a plumbing system, so a new sink, dishwasher or water line needs one. Replacing a fixture in the same location does not, and the plumbing permit usually sits alongside the building permit for the tenant improvement.
Does an office kitchenette need a commercial kitchen hood?
Usually not, if it is used for reheating food, coffee and light use. The BC Building Code sends commercial cooking equipment ventilation to NFPA 96, and an explanatory note says equipment used mainly for reheating food prepared elsewhere is not expected to need NFPA 96 treatment. A range or cooking that makes grease-laden vapour changes that, so the mechanical engineer and the authority having jurisdiction confirm.
Can a kitchenette go anywhere on an office floor?
It can go in many places, but it is simplest near the building's existing drain, vent and water risers, usually close to the core or the washrooms. The farther the sink is from those connections, the more piping, ceiling or floor work below and coordination with the landlord it takes.
Does WorkSafeBC require a break room in an office?
Not in every office. WorkSafeBC requires employers to provide a suitable area for storing and eating food when food could become unwholesome because of workplace contaminants or when eating is restricted at the workplace. Many offices still choose a break room for staff, and the floors in it must be kept free of slipping hazards.
Who designs the plumbing and exhaust for an office kitchenette?
The designer lays out the room and millwork, and engineers or qualified designers prepare the plumbing, mechanical and electrical design. Plumbing, mechanical and electrical trade contractors carry out the work under their own permits, coordinated by the general contractor and checked against the landlord's building standards.
Sources
- Get a plumbing permit, City of Vancouver
- When you need a permit, City of Vancouver
- Commercial Building Renovation, Building Permit Application Requirements (checklist), City of Vancouver
- Vancouver Building By-law, City of Vancouver
- BC Building Code 2024, Province of British Columbia
- Bulletin P24-01, 2024 Edition of the British Columbia Plumbing Code, Province of British Columbia
- OHS Regulation Part 4, General Conditions (floors, eating areas), WorkSafeBC
- Tenant Improvement Permits Informational Guide, City of Burnaby
- Bulletin Info-13, Tenant Improvement Process, City of Richmond
- Commercial building permit requirements, City of Richmond